Do you know about large equipment handling cranes?

scanning: author: from: time:2020-05-09 classify:
At the beginning, the main use of the crane is shipping and the port, so when introducing the crane, the port crane is a page that can not be ignored.

Mainly carry out 2-100 tons of heavy equipment hoisting, can achieve 80 tons of large equipment platform hoisting.
Lifting equipment is complete: with a maximum of 550 tons T hydraulic gantry crane, ordinary gantry crane, 250220T all kinds of truck cranes, car cranes and other lifting tools.
Professional crane driver, professional Si Suo certificate to take up the post.
Carry out standardized operation according to the hoisting instruction manual of Mingtong equipment

1. In order to ensure the orderly relocation of the company as a whole, the relocation work should follow the principle of "unified leadership, division of labor and responsibility, coordination and cooperation", and strive to ensure the smooth relocation.

1) pay attention to the lifting weight marked on the crane sign, which usually refers to the rated lifting weight of the crane and should be prominently indicated in the obvious position of the crane structure.

2) for the boom type crane, its rated lifting weight varies with the amplitude, and its lifting characteristic index is characterized by lifting moment. Signage

The calibrated value on the is the maximum lifting weight.

3) for a crane with divisible hoists (such as grab, balance beam, etc.), the total service weight of the hanger and material quality is rated and lifting is allowed.

The quality of the material is effective lifting weight.

 

2. Relocation steps:
I. preparatory work before relocation
II. Process control in relocation
III. Finishing work and site after relocation and hoisting